2019.07.01~2020.05.31 |
Design of operating Nuclear Power Plant Flood Protection |
Jace Korea |
Design of Flood Protection for Gori Nuclear Power Plant |
2014.09.04 ~ 2014.12.15 |
Design of operating Nuclear Power Plant Flood Protection |
JaceKorea
|
Design of Flood Protection
|
2014.05.01 ~ 2014.11.30 |
Structure Design of UAE Project BNPP No.1 & 2 Complex Building |
JaceKorea
|
Structural Design of UAE Nuclear Power Plant Complex Building
|
2013.05.01 ~ 2015.10.31 |
Gori No.2 Reactor Head Replacement Construction Engineering |
JaceKorea
|
Structural Design of Replacement Reactor Head
|
2013.05.01 ~ 2014.10.31 |
Youngkwang No.3 & 4 Site of Replacement Reactor Head Construction Engineering |
JaceKorea
|
Structural Design of Replacement Reactor Head
|
2013.05.01 ~ 2014.04.30 |
Hanbit No. 3 & 4 Replacement Reactor Head Construction Engineering |
JaceKorea
|
Structural Design of Replacement Reactor Head
|
2013.01.01 ~ 2013.12.31 |
Research of Uljin No. 3 & 4 SGR Construction Design |
JaceKorea
|
Structural Design of SGR
|