2020.12.03~2021.02.10 |
NCE Pre-RFP Project |
Gas Entec |
Osaka Gas Pre-RFP |
2020.11.04~2021.01.15 |
Development of Megawatt-class Floating Offshore Wind Power System |
KAIST |
Development of Floating Offshore Wind Power System |
2020.09.04~2020.12.25 |
FEED of Ilijan LNG Regasification Terminal |
AGP, GAS Entec |
Front End Engineering Design of Ilijan LNG Regasification Terminal |
2020.06.12~2020.09.18 |
Feasibility Study of Philippines Batangas Gas to Power Project |
Byuksan Engineering |
Advised and Review of Optimal LNG Supply and Demand Plans (including onshore terminals and FSRU) |
2020.05.25~2020.12.11 |
Study on Deriving Improvement Measures for Rescue of Marine Accidents |
Special Investigation Committee on the Sewol ferry disaster |
Technical and Engineering Review of Rescue Work Using Offshore Crane |
2019.08.12~2021.12.31 |
Development of Hull Maintain and Forced Restoration Technology for Overturned Ships |
KIMST
|
Development of Hull Maintain and Forced Restoration Technology for Overturned Ships
|
2019.08.28~2019.11.04 |
Feasibility Study of Mozambique Mafuto Gas Complex Power Generation Development |
Yoo Shin
|
Analysis of Gas Procurement
|
2019.06.21~2019.09.06 |
Buiild, Transportation, Installation of FLBT |
KRISO
|
Cost Estimation
|
2019.01.04~2019.02.23 |
Haengwon Wind Power Repowering Project |
YP Industry Development
|
Foundation Design of Wind Power
|
2018.10.08~2020.03.07 |
Development for Small LNG Production Base Model of Each Capacity |
KOGAS
|
Development for Small LNG Production Base
|
2018.07.12~2018.08.06 |
Design and Structure Calculation of Wind Power Generator of Hankyung Unit 4 |
KLEM
|
Design for Structure of Wind Power Generator
|
2017.11.20~2018.08.19 |
Total Engineering Service of LPG Marine Terminal |
UNITEX LP Gas Ltd.
|
LPG and HFO marine terminal design
|
2017.01.23~2017.12.30 |
Detail Engineering for Bahrain LNGIT Project |
GS E&C
|
LNG terminal jacket design
|
2016.03.01~2020.01.20 |
R&D on float over and multi-crane design and installation technology for offshore plant |
KRISO
|
Float over and multi-crane desgin and installation technology development for offshore plant
|
2016.12.01~2018.11.30 |
R&D on design and installation technology of multi-point mooring system for deep sea floating offshore plant |
KEIT
|
Multi-point mooring system design and installation technology development for deep sea
|
2015.10.01~2018.05.31 |
R&D on advanced usage of Lithium FPSO |
KIGAM
|
R&D on advanced usage of Lithium FPSO
|
2015.06.01~2018.05.30 |
Development of Floating Tidal Power System for Bridge for Self-sufficient Energy of Bridge |
Korea Institute Energy technology Evaluation and Planning
|
Design of Floating tidal Power System for Long & Lagre Bridge
|
2015.05.15~2017.05.14 |
Detail Design of NASR PKG2 Project |
Hyundai Heavy Industries
|
Tow Fatigue analysis for Jackets, Bridges & Flare Towers
|
2015.04.10~2015.06.30 |
Jacket Up Barge R&D Project |
CDS Industry
|
Design of Jack Up Barge for Wind Power Plant Intallation
|
2014.07.16~2014.12.31 |
VOPU CONVERSION FOR MARGINAL FIELD FPSO |
AGRO ENGINERING
/GAGASAN SND BHD MALAYSIA
|
Middle FPSO Conversion Basic Design
for Offshore Marginal Field in Malaysia
|
2014.07.02~2014.09.10 |
RIVER PULL OUT OF AHTS PROJECT |
AGRO ENGINERING
/PERDANA SND BHD MALAYSIA
|
1Million-Ton Ship Lift Design in Malaysia
|
2014.01.20~2014.06.30 |
Engineering Report for Carrigali HESS BCP Jacket Load-Out |
Sam-Gang M&T
|
Offshore Fixed Platform Ships Design
|
2013.07.17~2013.07.31 |
Jacket Fabrication Method Simulation |
Young Chang Heavy Industries, Co. Ltd.
|
Video Production of Offshore Fixed Platform Production Procedure
|
2013.07.05~2015.02.28 |
CARIGALI HESS BCP JACKET & PIPE ENGINEERING |
Young Chang Heavy Industries, Co. Ltd.
|
Production Design of Offshore Fixed Platform Structure Jacket
|
2013.04.01~2014.03.31 |
Lithum FPSO R&D Project |
KIGAM
|
EPC for Lithum FPSO Hull/Riser/Mooring/Deck House/Process Equipment Feed/Basic/Detail and Construction
|