2020.06.01~2020.12.31 |
Bid Design for National Route 77 Aphae-Hwawon Road Construction (Section 2) |
Soosung Engineering |
Port Structural Design |
2020.04.04~2020.60.30 |
Seomjin River Dam water turbine power generation facility manufacture, purchase, installation Project |
APEC |
Structure Review for Drainage Pipe Extension |
2019.11.01~2019.12.01 |
Goseong Hi Thermal Power Plant Vent Foundation Design |
S&D Engineering
|
Thermal Power Plant Vent Foundation Design
|
2019.07.09~2020.02.28 |
Woon Jin FD15000 Buoyancy Tank Extension Design and Structural Review |
Woong Jin Development
|
FD Buoyancy Tank Extension Design and Structural Review
|
2019.06.10~2019.07.31 |
Gamcheon Port Outskirt Facility Typhoon Damage Restoration Work |
Woong Jin Development
|
Stability Review for FD & Caisson
|
2019.05.15~2019.11.06 |
Detail Design of Mokpo Port Facilities Maintanance |
KECC
|
Vessel Docking, Lan Mooring Stability Review
|
2019.05.02~2019.12.31 |
Multiple Crane Maritime Lift Analysis |
Daebon Tech.
|
Multiple Crane Lift Analysis
|
2019.04.25~2019.09.30 |
Donghae Port Phase 3 Breakwater, Shore Protection #1 Construction Project |
Hyundai E&C
|
FD Reinforcement Design and Stability Review
|
2019.04.01~2019.06.30 |
Stability Review for FD Flotation and Caisson Launch |
Woong Jin Development
|
Stability Review for FD & Caisson
|
2019.03.26~2019.04.04 |
Shred Review of Yongdam3 Small Hydro Power Plant Outfall Floor Concrete |
APEC
|
Shred Review of Concrete
|
2019.03.20~2019.09.30 |
Alternative Design of Busan New Port Back Road |
Dong Myeong Engineering
|
Design of Road Temporary Facilities
|
2018.07.25~2018.12.21 |
Investigating and Reviewing Basic Data for Mooring Feasibility for Applying FLBT Coastal Zone |
KRISO
|
Feasibility Study and Safety Review for FLBT Mooring
|
2018.06.19~2019.02.18 |
Alternative Design of Incheon New Port Dredged Material Dump Site Revetment Construction |
Ara Tech
|
Structure Design for Revetment Construction
|
2018.01.19~2018.04.18 |
Lifting Method of MV Sewol and Technology Verification |
Sewol Hull Investigation Committee
|
Technology Verification for Lifting Method
|
2017.07.03~2017.07.31 |
Pontoon Ballast Review of International Passenger Jetty in Incheon Port |
Gwan-Ak Industries
|
Pontoon Ballast Review
|
2017.07.24~2017.08.31 |
Design of Hyundai-Steel By-Product Treatment Place Landfill Site |
Seil Engineering
|
FD Caisson stability review
|
2017.02.07~2017.06.30 |
Transportation and Installation Stability Analysis of Worldcup Bridge Construnction |
Samsung C&T
|
Transportation and installation Barge stability anasysis
|
2016.11.21~2016.11.30 |
Structure review of the temporary facility for Daecheong metropolitan area water transport pipeline relocation construction |
Watech
|
Structure review of the temporary facility for water transport pipeline relocation construction
|
2016.10.21~2016.11.20 |
Design of jacket reduction model structure for performance evaluation of leveling system |
CDS Industries
|
Design of jacket structure
|
2016.07.26~2016.08.20 |
Caisson stability review for Hongdo port east breakwater construction |
Hanyang
|
Stability review for caisson 3 ship
|
2016.06.07~2017.06.30 |
S-Oil RUC Project |
Daelim Industries
|
Caisson transport analysis and stabiliey review for RUC construction
|
2015.08.03~ |
Tuas Terminal Phase 1 Reclamation, Wharf Construction and Dredging |
Daelim Industries
|
Singapore TTP1 Site Transportation & Launch Analysis
|
2015.06.17~2015.12.31 |
Civil Design of SSPP P/J Jetty Catwalk |
Hyundai Heavy Industries
|
Design of Catwalk Material Type Change(Steel Truss-> Concrete Beam)
|
2014.12.12~2015.06.30 |
Yeo-Su New Nort Breakwater Turnkey Project |
Yadahm Engineering
|
Structure Specialized Analysis
|
2014.12.30~2015.06.30 |
Go-Sung Green Power Port Project |
Yoo Shin
|
Mooring Analysis
|
2014.11.10~2014.12.30 |
A-Trestle Structure Analysis for SHI Driven Pile |
Samkang M&T
|
A-Trestle Stability Design
|
2015.09.01~2015.06.26 |
Cross of Deep Water Test Site Construction Project |
Haelin Construction
|
Structure Design
|
2014.08.10~2014.09.25 |
Tender Design of Ulsan Oil Hub Tank Terminal |
ZENTECH Engineering
|
Stone Column R&D for Oil Hub Terminal Tank Foundation
|
2014.07.01~2014.09.30 |
FORT HILLS SE PROJECT(EPC)_Motion Study |
SK E&C
|
Onshore Plant Modulization and Marine Transportation Stability Review
|
2014.02.17~2014.03.31 |
Incheon International Passenger Wharf Construction (Step 2) - Caisson Floating Stability Review Project |
HYUNDAI Construction and Engineering
|
Caisson Transportation and Launching Stability Review
|
2013.08.12~2013.11.30 |
Basic Design of Ulsan Newport(#2-1) South Breakwater Construction |
Hangdo Engineering
|
Port Design
|
2013.10.15~2013.11.30 |
Barge Stability and Structure Stability Review for Yangsu Span Bridge Demolition Construction |
StrandJack korea
|
Large water bridge demolition using the Strand-Jack,
Ship behavior simulation and Structure Detail Design
|
2013.08.12~2013.11.30 |
Basic Design of Ulsan Newport(#2-1) South Breakwater Construction |
Hangdo Engineering
|
Caisson Transportation and Launching Stability Review
|
2013.07.16~2013.07.31 |
Analysis for Gunjang Span Bridge Transportation using 3600-ton Crane |
S&D Engineering
|
3600-ton Water Bridge Installation Design
|
2013.06.10~2013.06.26 |
Caisson 2 Ship Transportation, Launching, Floating and Tow Stability Review for Hongdo Port East Breakwater Construction |
Daehan Engineering
|
Caisson Transportation and Launching Stability Review
|
2013.05.01~2013.06.21 |
40Million-ton Ship Mooring Stability Review for HYUNDAI STEEL Dangjin Steel Mill |
Sekwang Co., Ltd.
|
40Million-ton Ship Mooring Analysis
|
2013.04.01~2013.07.31 |
Tender Design of Algeria Mostaganem 1600MW CCPP |
E-Power Engineering
|
Power Plant outfall Numerical Analysis and Structure Design
|
2013.01.08~2013.01.19 |
Stability Review of the Ship(Dong-ji 5) only for DCM |
Dong-Ah Geotechnical Engineering
|
DCM Ship Stability analysis
|