2019.02.19 ~ 2019.03.01 |
BLNG IT Project Subsea Pipeline Hydraulic Analysis |
GS E&C
|
LNG Terminal Subsea Pipeline Hydraulic Analysis
|
2018.07.02 ~ 2018.12.20 |
Analysis of the Unsteady Flow Stability of the Deep Sea Gas Pipeline and the Thermal Hydraulic Power Logic |
KOGAS
|
Analysis of the Flow Stability of Deep Sea Gas Pipeline
|
2017.10.31 ~ 2017.12.31 |
Design of Gangway including Pipeline |
BM Energy
|
Design of gangway and pipeline for LPG Receiving Terminal
|
2017.06.01 ~ 2019.05.31 |
Technical Consultant Service for Field Engineering Support of Subsea Pipeline |
HSS JV
|
Detail design of subsea pipeline for New Refinery Plant in Kuwait(5-30"x17km)
|
2017.01.23 ~ 2017.12.30 |
Detail Engineering for Bahrain LNGIT Project |
GS E&C
|
Detail engineering for LNG import terminal subsea pipeline
|
2015.12.21 ~ 2019.07.07 |
Detail Engineering Services for KNPC Al-Zour New Refinery Project Package #5 |
HSS JV
|
Detail engineering for refinery plant subsea pipeline in Kuwait
5-30""x17km
|
2015.03.30 ~ 2015.05.31 |
NSRP Complex P/J On-Bottom Stability of PKG-E Outfall Pipeline |
TOYO Construction
|
Calculation and Analysis
|
2015.02.02 ~ 2015.06.29 |
Tender Design of Bahrain LNG Import Terminal |
Yedahm Engineering
|
LNG Subsea Pipeline Design
|
2014.11.10 ~ 2014.12.30 |
NSRP Complex P/J On-Bottom Stability of Outfall Pipeline |
TOYO Construction
|
Calculation and Analysis
|
2014.08.10 ~ 2014.09.25 |
Tender Design of Ulsan Oil Hub Tank Terminal |
SK E&C
|
Oil Refinery Plant Submarine Pipeline 15 Lines(2”~25”X60m), Riser Basic Design
|
2014.05.07 ~ 2014.12.31 |
Tender Design of New Refinery Project(NRP) Package #5 |
SK E&C
|
Oil Refinery Plant Submarine Pipeline 8 Lines(16”~36”X9km), Riser Basic Design
|
2014.03.20 ~ 2014.04.30 |
Tender Design of Trans-Shipment in Venezuela |
Pantos Co., Ltd.
|
Submarine Pipeline Transportation and Installation Design
|
2014.02.19 ~ 2014.02.21 |
Tender Design of Konti Skan Submarine Cable Transportation |
Pantos Co., Ltd.
|
Submarine Pipeline Transportation and Installation Design
|
2013.08.01 ~ 2016.07.31 |
Marine Construction Work for Nghi Son Refinery and Petrochemical Complex Project Package #C |
SK E&C
|
Oil Refinery Plant Submarine Pipeline 2 Lines(48”X35km), PLEM/SPM-350K VLCC Detail Design
|
2013.01.21 ~ 2016.04.30 |
Jazan Refinery and Terminal Submarine Pipeline Design |
Hanhwa Construction
|
Oil Refinery Plant Submarine Pipeline 2 Lines(48”X9km), PLEM/SPM-310K VLCC Detail Design
|
2012.11.21 ~ 2013.07.31 |
Tender Design of UAE Mirafa IWPP Project |
E-Power Engineering
/Samsung Construction
|
Power Plant outfall Numerical Analysis and Structure Design
|
2012.11.01 ~ 2013.07.31 |
Tender Design of NSRP Marine Work Project |
SK E&C
|
Oil Refinery Plant Submarine Pipeline 2 Lines(48”X35km), PLEM/SPM-350K VLCC Basic Design
|